Skip to product information
Graywind Smart Roman Shades Compatible with Alexa Google Rechargeable Motorized Blinds with Remote Blackout Roman Window Shades Plain Fold Soft for Doors Bedroom, Custom Size (Flowline Midnight)
₩314
Sale price
₩314
Regular price
Shipping calculated at checkout.
About This
- Functional shades: 100% blackout fabric, classic plain fold roman shades with soft fabric, neat stack when raised. Roman window shades offers a classic and modern update to your home decor. Privacy & room darkening offered, ideal indoor window treatments for bedroom, living room, french doors etc. Cordless style, safe for children and pets. Rohs certificated and eco-friendly.
- 15-channel timing remote: Able to seperately & group control maximum 15 smart shades. It provides favorite position as well (the basic program of remote will be set before shipment). 20 date-time groups available, add any electric curtains to any schedules to achieve automatic timing control as preference. Support handheld or wall-mounted.
- Bluetooth motor solutions: Called ble motor for short. Work directly with graywind app via bluetooth within range of singal (about 99ft/30m), no smart bridge needed. Easy to pencentage control, set top/bottom and favorite limit positions on app. Also, battery status display is available. Recommended for users who only need to control smart blinds via remote controller or app at home. 2.4ghz ble hub is available for create groups, set timing shedules or other routines and alexa & google control.
- Zigbee motor solution: Work with echo plus 2nd gen./ echo show 2nd gen./ echo studio/ echo show 10 3rd gen./ echo 4th gen. directly, no hub required. Realize smart control via not only the app anywhere, but also voice command, such as group and percentage control etc. 2.4ghz zigbee hub is available to connect with other alexa models & google.
- Made to order: Click "customize now", custom dimensions and details. Please check Amazon reconfirmation messages within 24 hours, order will proceed if we don't get reply in 48 hours.
- After service: Graywind smart blinds are designed for easier installation, manuals and video guide available. We provide long-term technical support.
Overview
- Material : 1 - Rechargeable Smart Motor
- Product Dimensions : 120"L x 99"W
- Brand : Graywind
- Color : Blackout - Flowline Midnight
- Opacity : Blackout
CARE & MAINTENANCE
To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.
SHIPPING & RETURNS
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.